Environmental

  • Air Monitoring June 2019

    Download File
  • Carlingford Bird Survey 2018

    Download File
  • Warrenpoint Sediments 2018

    Download File
  • Nippon HRA Gases 2019

    Download File
  • Report 4779 2016

    Download File
  • Warrenpoint Port Dredge Monitoring Report 2017

    Download File
  • Findings of Site Characterisation Study

    Copy of the Findings of the Site Characterisation Study

    Download File
  • Q&A; responses to Stakeholder event October 2018

    Warrenpoint Port held a public stakeholder event on proposals for a new placement site for dredged material in the mouth of Carlingford Lough.  A summary of questioned raised at the event, held at Warrenpoint Town Hall on 15th October, and responses to them, can be accessed below.

    Download File
  • Best Practical Environmental Option Assessment 2015

    Download File

Stay Conected With Us: